Antennas EME Exclusion Zones
Prior to Revision 6, the Antennas EME Exclusion Zones drawing (‘R1’), when provided, showed occupational and general public EME exclusi...
29
Jul
Optus site inspection instruction
Inspections
The Supplier will notify Optus at least 24 hours in advance of inspections required or requested to be made by Optus or the...
26
Jul
Australia Telecom abbreviation
Term / AbbreviationDescriptionABAS BuiltCADComputer Aided DraftingCheck-InProcess wi...
21
Jul
EME Reporting Process
EME Reporting Process
As the lead carrier is responsible for running any required Deployment Code processes and notifications, the lead...
16
Jul
New Works at Existing Sites
If new works are to be carried out at an existing Optus site (such as network re-arrangement, technology upgrade or transmission upgrad...
12
Jul
What is As Built Drawings in Telecom Industry
As Built Drawings instruction
The Supplier’s QMP must set-out a process for the production of the Site As-Built drawings. As-built draw...
08
Jul
As Built Redline Drawing Requirements in Telco industry
As part of its Supplier’s QMP, the Phase 3 & 4 Supplier must have a process for the redline marking-up of the For Construction draw...