21 Jul Telco EME Reporting Process August 17, 2023 By admindev 0 comments EME Reporting Process As the lead carrier is responsible for running any required Deployment Code processes and notifications, the lead... Continue reading
16 Jul Telco New Works at Existing Sites August 17, 2023 By admindev 0 comments If new works are to be carried out at an existing Optus site (such as network re-arrangement, technology upgrade or transmission upgrad... Continue reading
12 Jul Telco What is As Built Drawings in Telecom Industry August 17, 2023 By admindev 0 comments As Built Drawings instruction The Supplier’s QMP must set-out a process for the production of the Site As-Built drawings. As-built draw... Continue reading
08 Jul Telco As Built Redline Drawing Requirements in Telco industry August 17, 2023 By admindev 0 comments As part of its Supplier’s QMP, the Phase 3 & 4 Supplier must have a process for the redline marking-up of the For Construction draw... Continue reading
07 Jul Telco Optus For Construction Drawings instruction August 17, 2023 By admindev 0 comments FOR CONSTRUCTION drawing package for a new and existing sites shall include a cover sheet (00sheet), site specifications (G1 sheet), ov... Continue reading
04 Jul Telco Optus Not For Construction Drawings August 17, 2023 By admindev 0 comments NOT FOR CONSTRUCTION drawings are occasionally used to acquire (in property terms) the nominated preferred candidate site. The NFC site... Continue reading
02 Jul Telco Instruction of Site Elevation Drawing in telecom industry August 17, 2023 By admindev 0 comments Site Elevation Drawing Draft Site Elevation drawing (‘P2’) shall contain the following information: Tower / building / structure e... Continue reading
01 Jul Telco Site Layout Drawing in Telecom industry at Australia August 17, 2023 By admindev 0 comments Site Layout Drawing Draft Site Layout drawing (‘P1’) shall contain the following information: Locality map – digital image exerted... Continue reading
30 Jun Telco General requirement for DSL Drawing August 17, 2023 By admindev 0 comments The drawing package should include at least: site locality plan overall site plan detailed site set-out plan and one or... Continue reading
29 Jun Telco What is DSL in Telco industry August 17, 2023 By admindev 0 comments Draft Site Layout (DSL) Drawings Prime & Backup Candidates Draft Site Layout drawings for the prime candidate are intended for pre... Continue reading