29 Jul Telco Optus site inspection instruction August 17, 2023 By admindev 0 comments Inspections The Supplier will notify Optus at least 24 hours in advance of inspections required or requested to be made by Optus or the... Continue reading
02 Jul Telco Instruction of Site Elevation Drawing in telecom industry August 17, 2023 By admindev 0 comments Site Elevation Drawing Draft Site Elevation drawing (‘P2’) shall contain the following information: Tower / building / structure e... Continue reading
10 May Telco OPTUS Site Design Environmental Protection August 17, 2023 By admindev 0 comments General The Supplier will take all steps necessary to protect the environment and in particular will meet the requirements of th... Continue reading
25 Jan Telco Optus Telco Site Fence design August 17, 2023 By admindev 0 comments Site Fence 1. Standards Selection of a fence or not is to follow the section Site Fence Decision Strategy. All materials for the... Continue reading