26 Apr STR, Telco Rooftop Antenna Structure Design August 17, 2023 By admindev 0 comments If the antenna structure is on a rooftop, the following factors must be considered: • Determine which equipment is to be mounted on the... Continue reading
29 Jul Telco Optus site inspection instruction August 17, 2023 By admindev 0 comments Inspections The Supplier will notify Optus at least 24 hours in advance of inspections required or requested to be made by Optus or the... Continue reading
30 Jun Telco General requirement for DSL Drawing August 17, 2023 By admindev 0 comments The drawing package should include at least: site locality plan overall site plan detailed site set-out plan and one or... Continue reading